Under the normal working condition of the ball mill, the ball mill runs from 720h to 3000h (according to the working conditions, and the specific time is agreed by both the supplier and the buyer). Accumulated the mass of the broken balls during the ball mill operation, call it as the mass. The broken balls left in the ball mill are then picked up, weighed, and the total weight of the balls used during this period is measured.
The fraction of broken balls is calculated according to the following formula (B1):
ρ ——broken rate,%;
Q ——initial loading balls weight,t;
Q’ ——Quantity of the grinding balls during the normal working,t;
Q1 ——The mass of the broken balls during the normal working,t;
Q2 ——Top ball mill and do the test, the mass of the broken balls in the ball mill,t.
Betty 86 158 5636 2791
Star 86 18756355533 starwang577322@foxmail.com
Address: Heli Industrial Zone, Ningguo City, Xuancheng, Anhui Province, China.
molding line
metal mold
heat treatment furnace
grinding media
Ball Production Ancillary Facility
Wrench
Induction Furnace